
Plant 80 m³
Industrial plant of maximum capacity. From 80 m³ of polystyrene concrete por turno, full automation, minimal staff. CNC cutting technology.
Descripción de la Planta
From 80 m³ por turno — an industrial solution for large businesses.
Complete cycle: from powerful pre-expander to CNC cutting complexes. Turnkey delivery with supervision, commissioning and training.
Products comply with GOST, suitable for all construction types.
What's Included
Complete list of equipment and components included in the plant delivery.
01Polystyrene foamer PND-1202
- Capacidad25–30 m³/h
- Volume2500 L
- Potencia7 kW
The most powerful pre-expander. For high-capacity plants.
- •continuous cycle
- •maximum capacity
- •stable quality
02Conveyor dryer SK-25
- Capacidad12–15 m³/h
Drying expanded polystyrene granules.
03Polystyrene storage bunker
- Volume38 m³
Storage and aging of expanded granules.
04Pneumatic pump PN-25
Transports polystyrene granules.
06Mixer with pump MPTS 10-2
- Capacidadup to 10 m³/h
Dual-shaft mixer for industrial volumes.
- •dual shaft
- •highest uniformity
- •industrial power
08Corte CNC Complex MRK
- ControlCNC
- Accuracy±1 mm
Automatic cutting complex.
- •doubled productivity
- •CNC control
- •high precision
Equipos Adicionales
Industrial Compresor
For form lubrication
CST SHIFT AIR System
Full component consumption control
Repuestos y Herramientas
Extended kit
Conveyor System
Automatic block transfer
Potencia Equipment
Cables, cabinets, protection
Complete equipment list, specification and delivery composition are provided with the commercial proposal.
Get Complete List →Especificaciones
Proyectos Completados

Producción en Aramil
Proyecto completado de planta de hormigón de poliestireno en Aramil.

Complejo de Corte en Kuwait
Producción de bloques de hormigón de poliestireno usando tecnología de corte — 360 m³ por día.

Block Production in Nepal
Line for 80 m³ polystyrene concrete block production in Nepal.
¿Listo para comenzar la producción?
Leave a request and we will prepare an individual commercial proposal with a payback calculation for your budget.


