CST+7 (905) 805-95-59
Plant 30 m³
Turnkey Solution

Plant 30 m³

The optimal plant for starting polystyrene concrete production. Capacity of 30 m³ per shift, fast launch and minimal investment. Ideal for small and medium businesses.

30 m³/shift
Capacity
3–4 people
Staff
from 35 days
Launch Time
Manual
Control
from 2,000,000 ₽

Plant Description

A compact solution for launching a profitable building materials business.

The polystyrene concrete block production plant combines high productivity, minimal footprint and fast payback. This is the ideal turnkey solution for small and medium businesses.

Equipment Advantages:

  • High construction speed: plant capacity allows producing material volume for building 1 house in just 3–4 days.
  • Compact: production area — from just 150 m².
  • Staff savings: line operation requires 3–4 people.
  • Quick start: production launch in just 25 days.

Configuration and Operating Principle:

The basic configuration includes a professional mixer with gerotor pump and a set of mega-block forms. The line is designed to work with ready-made (purchased) polystyrene granules.

The process is maximally simplified:

  1. Precise water dosing is ensured by an automatic dispenser.
  2. Polystyrene granules are fed from standard 0.5 m³ packaging.
  3. Cement is loaded manually from bags.

Upgrade Potential:

The plant design allows for modernization. In the future, you can install automated component dosing systems and your own polystyrene foaming section to reduce production costs.

What's Included

Complete list of equipment and components included in the plant delivery.

Mixer with gerotor pump MPTS 5-101

Mixer with gerotor pump MPTS 5-1

  • Capacity5 m³/h
  • Chamber volume600 L
  • Power8.5 kW

Compact forced action mixer for polystyrene concrete mixture preparation.

  • •Manual cement and polystyrene loading
  • •Built-in water dispenser
  • •25-meter concrete pipeline
Mega-block forms 2400×600×40002

Mega-block forms 2400×600×400

  • Block size2400×600×400 mm
  • Blocks per form2
  • Number of forms20 pcs

Forms for mega-block pouring. 20 forms allow manufacturing 1 house in 3-4 days.

  • •corner blocks
  • •tie beam blocks
  • •quick form assembly
  • •steel 4 mm

Additional Equipment & Components

Compressor

For form lubrication with sprayer

Water Dosing System

Automatic mixing water control

Spare Parts & Tools

Spare parts kit and installation tools

Cable Products

Power cables and switchgear

Complete equipment list, specification and delivery composition are provided with the commercial proposal.

Get Complete List →

Specifications

Capacity30 m³/shift
Mixture densityD150–D600
Dosing typeManual
ControlManual
Installed power9.5 kW
Supply voltage380 V, 50 Hz
Production areafrom 150 m²
Ceiling heightfrom 3 m
Staff count3–4 people
Launch timefrom 25 days

Completed Projects

Production in Aramil
Aramil, Sverdlovsk Oblast, Russia

Production in Aramil

Completed polystyrene concrete plant project in Aramil.

2009-06-15
Read more →
Production in Bogdanovich
Bogdanovich, Sverdlovsk Oblast, Russia

Production in Bogdanovich

Completed polystyrene concrete plant project in Bogdanovich.

2011-03-10
Read more →
Production in Krasnodar Krai
Krasnodar Krai, Russia

Production in Krasnodar Krai

Completed polystyrene concrete plant project in Krasnodar Krai.

2014-05-01
Read more →
Cutting Complex in Kuwait
Kuwait

Cutting Complex in Kuwait

Polystyrene concrete block production using cutting technology — 360 m³ per day.

2019-04-25
Read more →

Ready to start production?

Leave a request and we will prepare an individual commercial proposal with a payback calculation for your budget.

Submit Request →

Сіз қазақ тілінде сөйлейсіз бе?

Сайттың қазақша нұсқасына өтуіңізге болады

[ SERVICE GATEWAY ]

Order Checkout

[ CONTACT DIRECTLY ]
Call Us:+7 (905) 805-95-59
Call Us
Write in messengers:MAX